Power utilities use a variety of Industrial Control Systems (ICS) to manage their operations which are structured into six independent but interconnected zones: Power Generation, High Voltage (HV) Transmission System Operation (TSO), Medium Voltage (MV) Distribution System operation (DSO), MV Distributed Generation, Low Voltage (LV) power delivery and LV Distributed Generation. Each of these zones includes electrical and mechanical assets, process controllers and communications, which perform local control within their zone and communicate with other zones. The power grid structure described here is in line with the deployment of the Smart Grid architecture, which also includes MV and LV distributed generation, and Industrial Internet of Things (IIoT).

Hora

16:00 - 17:00 hs GMT+1

Organizador

Information Systems Security Association
Compartir
Enviar a un amigo
Mi email *
Email destinatario *
Comentario *
Repite estos números *
Control de seguridad
Abril / 2026 244 webinars
Lunes
Martes
Miércoles
Jueves
Viernes
Sábado
Domingo
Lun 30 de Abril de 2026
Mar 31 de Abril de 2026
Mié 01 de Abril de 2026
Jue 02 de Abril de 2026
Vie 03 de Abril de 2026
Sáb 04 de Abril de 2026
Dom 05 de Abril de 2026
Lun 06 de Abril de 2026
Mar 07 de Abril de 2026
Mié 08 de Abril de 2026
Jue 09 de Abril de 2026
Vie 10 de Abril de 2026
Sáb 11 de Abril de 2026
Dom 12 de Abril de 2026
Lun 13 de Abril de 2026
Mar 14 de Abril de 2026
Mié 15 de Abril de 2026
Jue 16 de Abril de 2026
Vie 17 de Abril de 2026
Sáb 18 de Abril de 2026
Dom 19 de Abril de 2026
Lun 20 de Abril de 2026
Mar 21 de Abril de 2026
Mié 22 de Abril de 2026
Jue 23 de Abril de 2026
Vie 24 de Abril de 2026
Sáb 25 de Abril de 2026
Dom 26 de Abril de 2026
Lun 27 de Abril de 2026
Mar 28 de Abril de 2026
Mié 29 de Abril de 2026
Jue 30 de Abril de 2026
Vie 01 de Abril de 2026
Sáb 02 de Abril de 2026
Dom 03 de Abril de 2026

Publicidad

Lo más leído »

Publicidad

Más Secciones »

Hola Invitado