Power utilities use a variety of Industrial Control Systems (ICS) to manage their operations which are structured into six independent but interconnected zones: Power Generation, High Voltage (HV) Transmission System Operation (TSO), Medium Voltage (MV) Distribution System operation (DSO), MV Distributed Generation, Low Voltage (LV) power delivery and LV Distributed Generation. Each of these zones includes electrical and mechanical assets, process controllers and communications, which perform local control within their zone and communicate with other zones. The power grid structure described here is in line with the deployment of the Smart Grid architecture, which also includes MV and LV distributed generation, and Industrial Internet of Things (IIoT).

Hora

16:00 - 17:00 hs GMT+1

Organizador

Information Systems Security Association
Compartir
Enviar a un amigo
Mi email *
Email destinatario *
Comentario *
Repite estos números *
Control de seguridad
Agosto / 2025 309 webinars
Lunes
Martes
Miércoles
Jueves
Viernes
Sábado
Domingo
Lun 28 de Agosto de 2025
Mar 29 de Agosto de 2025
Mié 30 de Agosto de 2025
Jue 31 de Agosto de 2025
Vie 01 de Agosto de 2025
Sáb 02 de Agosto de 2025
Dom 03 de Agosto de 2025
Lun 04 de Agosto de 2025
Mar 05 de Agosto de 2025
Mié 06 de Agosto de 2025
Jue 07 de Agosto de 2025
Vie 08 de Agosto de 2025
Sáb 09 de Agosto de 2025
Dom 10 de Agosto de 2025
Lun 11 de Agosto de 2025
Mar 12 de Agosto de 2025
Mié 13 de Agosto de 2025
Jue 14 de Agosto de 2025
Vie 15 de Agosto de 2025
Sáb 16 de Agosto de 2025
Dom 17 de Agosto de 2025
Lun 18 de Agosto de 2025
Mar 19 de Agosto de 2025
Mié 20 de Agosto de 2025
Jue 21 de Agosto de 2025
Vie 22 de Agosto de 2025
Sáb 23 de Agosto de 2025
Dom 24 de Agosto de 2025
Lun 25 de Agosto de 2025
Mar 26 de Agosto de 2025
Mié 27 de Agosto de 2025
Jue 28 de Agosto de 2025
Vie 29 de Agosto de 2025
Sáb 30 de Agosto de 2025
Dom 31 de Agosto de 2025

Publicidad

Lo más leído »

Publicidad

Más Secciones »

Hola Invitado